Chippewa Cree Construction Corp.

Middle Dry Fork Pipeline

Project Description

The Middle Dry Fork Pipeline consists mainly of 8-inch diameter PVC pipe and serves as a connection between the Newtown Water System and 3 Mile Storage tank, which provides potable water to the villages near Box Elder. In June 2010, during severe flooding, the Middle Dry Fork Pipeline was installed to provide potable water to provide potable water to residents during these emergency conditions.

Project Details

  • Contractor: Chippewa Cree Construction Corporation
  • Engineer: AE2S